Inspection Checklist
This list has been created as a guide only, each inspection will include but not be limited to the following:
Footings:
- Proper set backs to be checked with strings on each side.
- Soils report and/or compaction test results.
- Size, width and depth.
- Ufer ground.
- Minimum frost protection.
- Be sure that the ground is not frozen or disturbed.
- No mud, snow, water, sticks, grass etc…
Foundation:
- Proper steel placement, horizontal, vertical and around windows.
- Ufer ground.
- Grade beam in place.
- 90% compaction of back fill.
Temporary Power:
- Ground rod in place and proper length
- GFCI protection of all circuits.
Underground Plumbing:
- Check for air or water test.
- Proper size of drains and vents.
- Insure proper bedding material.
- No bridging of pipe.
- Proper separation between plumbing and concrete
Sheer Walls:
- Check for proper nailing. (fasteners not over driven)
- Check for foundation straps per engineering.
- All windows and doors are to be installed and properly flashed with caulk and 9” flashing.
- All studs are secured to the sheathing.
- All girder trusses have columns under them.
Rough Plumbing
- Check for proper size of drains and vents.
- Nail plates must be in place.
- When walls are over bored at the top plates, both top plates must be strapped.
- Shower pan must be blocked, and at the convenience of the contractor must be installed and tested. (preferred at 4-way)
- PEX water lines must be secured at a minimum of 32” o.c. and must be secured within 8” of the manifold if used.
- Air or water test the system.
- Check floor joist to insure that the drains and vents haven’t cut into the flange if “I-Joists” are used.
- Insulation of any pipe in an area exposed to freezing.
Rough Mechanical
- Check for pressure test on the gas line.
- Proper clearance for the B-vent and the vent connectors from combustibles.
- Insulation shield must be in place in the attic.
- Proper slope and rise on the vents.
- Double wall B-vent once the vent becomes a common vent for more than one appliance.
- Screws and seal at joints in ducts.
- Ends of return air ducts sealed in I-joists.
- No electrical boxes in ducts.
- Caps and shutoffs at all gas pipes.
- No electrical cables running parallel inside ducts.
- Proper working clearance at the front of the furnace.
- Proper vent terminations for furnace and fireplace vents.
- Insulation of all ducts in the attic.
- Check for proper combustion air. (justification needed if from attic area.)
Rough Electrical
- Grounding system must be in place.
- Service panel completed.
- Rough make-up of breaker panel.
- No-lock on feeders in panel.
- No damage to insulation of the feeders or NM cable.
- Proper bending radios for all cables.
- Nail plates if closer the 11/4” for face of studs.(inside or outside of wall)
- Proper smoke detector locations.
- All bedroom circuits must be AFCI protected including smoke detector circuit.
- Switched light in the mechanical area.
- Proper size of the wire to the 20 amp. circuits.
- Minimum of two small appliance branch circuits.
- Minimum of 6” of wire in the boxes with at least ¼” of insulation extending into the box.
- NM cable secured within 12” of the boxes and no less than 4’ 6” o.c.
- Double outlets if double sinks in the bathroom. Unless one outlet is placed between the sinks.
- Exhaust fan where needed.
- Proper tub motor bonding.
- Outlet/circuit for the tub motor.
- No outlet boxes on both sides of rated wall in the same area.
Framing
- Do shear inspection if not already completed.
- Check for proper hold downs, anchors, straps and hangers.
- Check all header sizes. No girder bearing on 2x header without engineering.
- Trusses braced per specs.
- Check for compliance with engineering.
- Check floor joist spans.
- Attic access in proper locations. (not in closets) Latched if in garage.
- Proper attic ventilation provided.
- Rated door between garage and house.
- Proper head room at the stairs.
- Check rise and run of stairs, insure consistency.
- Tempered window where required.
- Fire blocking and draft stopping in place.
- Proper separation of all chases.
- Gap in roof sheathing per the manufacturer specs.
- Ice and water shield properly installed at edges and valleys of the roof.
- Insure all point loads are carried to footings.
Insulation:
- Proper R- value
- Insulation behind tubs/showers.
- Foam all penetrations.
- Insulate around windows and doors.
- Proper vapor barrier installed.
- Wall insulation in basement if used must extend a minimum of 48” below grade or to the ground.
- Proper air flow provided between soffit and roof vents. (bonus areas)
Lath:
- Proper flashing/termination at the porch.
- 3 1/2” weep screed extending over foundations.
- Caulk penetrations.
- Proper fastening of lath.
- Minimum two layer of felt.
- Complete compliance with evaluation report.
- Tent if under 40 deg.
- Installers cards.
Power to Panel”
- Grounding system in place. UFER
- GFCI protected outlet.
- Cover on breaker panel.
- 20 amp. breaker in panel.
- 4-way complete.
Sewer Lateral:
- Proper bedding.
- Proper slope.
- 10 head feet of water for water test.
- Cast iron combo.
- Proper amount and location of clean-outs.
Final:
- Proper house numbers on house.
- City sidewalks, curbs and gutters must be clean and free from damage. (cracks or chips)
- Proper finish grade, no big dirt piles, Proper slope away from the house, max. slope of 1 unit vertical to 2 units horizontal, drainage doesn’t cause damage to other lots, down spout extentions at rain gutters.
- Check slope on the driveway. It must have a positive slope toward the street and shall not exceed 20% (1in5). If it is steeper than 12.5% (1in 8) steps must be provided.
- Check exterior steps for proper rise and run, they shall not have a slope of over ¼” per foot.
- Check outside GFCI outlets to insure that they are in proper working order and that they have the proper bubble type covers.
- Garage must have 5/8” type X sheetrock on walls and ceilings, two layers on the ceiling with living area above.
- 20 minute rated door from house to the garage.
- Garage outlets are GFCI protected.
- Check to see that all of the plumbing is properly connected.
- Check the dish washer and the disposal to see that they are hooked up.
- Anti tilt brackets on the range.
- Shut off valves at all gas lines.
- Minimum of two small appliance branch circuits in the kitchen area.
- Floor coverings must be complete.
- Check all electrical circuits.
- Attic access in place.
- Insulation in the attic and basement with the insulation certificate in place.
- Stucco installers card must be left for the owner per the ICC evaluation report.
- All bedroom circuits including smoke detectors must be Arch Fault Protected.
- Check for tempered window in proper places.
- Check all hand and guard rails.
- Check for proper venting, combustion air and clearances for all gas fired appliances.
- If drier is in a closet it must have proper make-up air.
- All wall ties in the basement must be removed.
- Check for proper landscape in sunrise meadows and lake mountain estates plat J.
- Plumbing walls must be provided to protect all 11/2” drains and vents in unfinished areas.
- Check for proper support/protection of gas lines.
- Check floor drain, seismic straps, thermal expansion devises and temp./pressure valves at the water heater.